GeneratorMax
Use GeneratorMax to identify future dividend payments and plan your income.
All shares
You're viewing the DividendMax demonstration portfolio.
You can begin your own portfolio when you sign up:
Activate Free TrialYou're in Demo Mode
You currently don't have access this feature, however you can preview the functionality.
This is a fully-functional demo intended to showcase the usefulness of this product using old data.
By proceeding you acknowledge that shown here is old data for demonstration purposes only.
Get the real data
To immediately activate your free account and see the live data you can log in with Facebook or LinkedIn:
-
May 2012Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
25 April 201228 May 2012Final24.5p1883.0p£13.01
-
18 April 201228 May 2012Final14.2p995.0p£14.27
-
25 April 201228 May 2012Special45.0p1883.0p£23.90
-
02 May 201229 May 2012Final1.9p247.3p£7.68
-
02 May 201230 May 2012Final1.5p173.3p£8.66
-
22 February 201231 May 2012Final70.0p4850.0p£14.43
-
02 May 201231 May 2012Final13.5p1566.0p£8.62
-
09 May 201231 May 2012Interim1.31p72.52p£18.06
-
02 May 201231 May 2012Final2.65p271.4p£9.76
-
02 May 201231 May 2012Final15.2p934.5p£16.27
-
21 March 201231 May 2012Final9.2p408.4p£22.53
-
25 April 201231 May 2012Final13.1838p348.07p£37.88
-
02 May 201231 May 2012Quarterly3.52p363.1p£9.69
-
16 May 201231 May 2012Interim0.5p108.3p£4.62
-
02 May 201231 May 2012Quarterly3.3p545.0p£6.06
-
June 2012Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
02 May 201201 June 2012Final2.96p238.88p£12.39
-
02 May 201201 June 2012Final20.65p570.5p£36.20
-
18 April 201201 June 2012Final11.3p414.1p£27.29
-
02 May 201201 June 2012Final6.2p280.64p£22.09
-
21 March 201201 June 2012Final24.7p1912.0p£12.92
-
18 April 201201 June 2012Final4.1p528.0p£7.77
-
02 May 201201 June 2012Final25.8p2289.84p£11.27
-
02 May 201201 June 2012Final30.25p2529.0p£11.96
-
02 May 201201 June 2012Final2.0p170.4p£11.74
-
16 May 201201 June 2012Final6.3p331.85p£18.98
-
02 May 201201 June 2012Final5.3p204.2p£25.95
-
02 May 201201 June 2012Final1.2p130.1p£9.22
-
09 May 201201 June 2012Final4.41p549.5p£8.03
-
02 May 201201 June 2012Final36.5p1298.0p£28.12
-
02 May 201206 June 2012Final6.75p376.6p£17.92
-
18 April 201207 June 2012Final3.5p214.0p£16.36
-
09 May 201207 June 2012Final9.7p523.5p£18.53
-
02 May 201208 June 2012Quarterly1.0p317.0p£3.15
-
09 May 201208 June 2012Final11.0p2055.0p£5.35
-
02 May 201208 June 2012Final6.7p440.5p£15.21
-
09 May 201208 June 2012Final1.05p28.76p£36.51
-
16 May 201208 June 2012Interim3.48p362.2p£9.61
-
02 May 201211 June 2012Final14.5p367.6p£39.45
-
09 May 201212 June 2012Final1.56p131.4p£11.87
-
16 May 201212 June 2012Final7.4p549.0p£13.48
-
25 April 201213 June 2012Final11.11p389.7p£28.51
-
23 May 201213 June 2012Final1.75p77.0p£22.73
-
23 May 201213 June 2012Quarterly42.32p1406.5p£30.09
-
09 May 201213 June 2012Quarterly19.81p2862.0p£6.92
-
09 May 201214 June 2012Interim4.4p479.1p£9.18
-
09 May 201214 June 2012Special24.0p961.0p£24.97
-
09 May 201214 June 2012Final7.67p961.0p£7.98
-
02 May 201215 June 2012Final6.37p327.0p£19.48
-
16 May 201215 June 2012Final10.5p446.9p£23.50
-
16 May 201215 June 2012Final11.6p251.18p£46.18
-
09 May 201215 June 2012Final5.11p246.6p£20.72
-
30 May 201215 June 2012Interim2.0p503.5p£3.97
-
16 May 201215 June 2012Final21.9p2435.0p£8.99
-
04 April 201215 June 2012Final6.93p254.8p£27.20
-
09 May 201215 June 2012Final16.25p1490.0p£10.91
-
23 May 201215 June 2012Quarterly16.0p2237.0p£7.15
-
09 May 201215 June 2012Final6.0p1220.0p£4.92
-
25 April 201215 June 2012Final2.925p129.5p£22.59
-
16 May 201215 June 2012Final5.8p366.0p£15.85
-
16 May 201218 June 2012Final12.8p648.5p£19.74
-
09 May 201219 June 2012Final11.9p566.56p£21.00
-
16 May 201220 June 2012Final7.53p280.0p£26.89
-
23 May 201220 June 2012Final6.0p222.6p£26.95
-
23 May 201220 June 2012Interim4.2p553.0p£7.59
-
16 May 201221 June 2012Final1.0p338.0p£2.96
-
09 May 201221 June 2012Quarterly27.92p2287.0p£12.21
-
09 May 201221 June 2012Quarterly27.92p2216.5p£12.60
-
16 May 201221 June 2012Final42.3p1527.0p£27.70
-
23 May 201222 June 2012Final17.0p718.0p£23.68
-
06 June 201222 June 2012Final23.0p3161.84p£7.27
-
23 May 201222 June 2012Final0.5p242.7p£2.06
-
30 May 201222 June 2012Final18.0p1265.0p£14.23
-
30 May 201226 June 2012Final25.4p2090.0p£12.15
-
09 May 201227 June 2012Quarterly4.95p476.4p£10.39
-
23 May 201229 June 2012Final9.77p1345.0p£7.26
-
13 June 201229 June 2012Interim0.5p108.3p£4.62
-
06 June 201229 June 2012Quarterly3.2p346.7p£9.23
-
18 April 201229 June 2012Final3.5p130.0p£26.92
-
July 2012Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
23 May 201202 July 2012Interim6.0p1261.0p£4.76
-
06 June 201202 July 2012Final11.0p858.5p£12.81
-
09 May 201202 July 2012Final18.3p1308.0p£13.99
-
30 May 201202 July 2012Interim2.2p149.4p£14.73
-
06 June 201202 July 2012Quarterly2.32p450.0p£5.16
-
30 May 201202 July 2012Final20.3p1051.0p£19.31
-
30 May 201202 July 2012Final6.8p845.0p£8.05
-
13 June 201202 July 2012Interim1.79p1770.0p£1.01
-
30 May 201203 July 2012Final10.0p341.3p£29.30
-
06 June 201203 July 2012Interim9.0p1628.0p£5.53
-
13 June 201204 July 2012Final2.01p239.8p£8.38
-
06 June 201204 July 2012Final1.575p250.0p£6.30
-
16 May 201205 July 2012Quarterly5.7p726.0p£7.85
-
09 May 201205 July 2012Quarterly17.0p1749.5p£9.72
-
20 June 201206 July 2012Quarterly1.75p192.0p£9.11
-
13 June 201206 July 2012Interim5.95p637.5p£9.33
-
23 May 201206 July 2012Final4.0p91.25p£43.84
-
25 April 201206 July 2012Final8.5p236.5p£35.94
-
06 June 201206 July 2012Interim1.0p93.5p£10.70
-
30 May 201206 July 2012Interim5.6p758.5p£7.38
-
23 May 201206 July 2012Final6.0p290.5p£20.65
-
06 June 201206 July 2012Interim8.5p1932.0p£4.40
-
25 April 201206 July 2012Final10.13p380.0p£26.66
-
18 April 201206 July 2012Final10.6p1190.0p£8.91
-
06 June 201206 July 2012Final17.5p1102.0p£15.88
-
06 June 201206 July 2012Quarterly1.44p137.0p£10.51
-
06 June 201206 July 2012Final2.3p191.0p£12.04
-
06 June 201206 July 2012Interim0.55p155.0p£3.55
-
06 June 201209 July 2012Final17.14p1146.0p£14.96
-
06 June 201209 July 2012Interim1.05p106.0p£9.91
-
06 June 201209 July 2012Final10.95p146.3p£74.85
-
30 May 201210 July 2012Final5.2p571.5p£9.10
-
30 May 201213 July 2012Final10.8p475.0p£22.74
-
06 June 201213 July 2012Interim4.6p586.5p£7.84
-
16 May 201213 July 2012Final11.6p378.0p£30.69
-
30 May 201213 July 2012Final13.0p480.5p£27.06
-
13 June 201213 July 2012Final3.5p115.5p£30.30
-
30 May 201213 July 2012Interim5.3p519.0p£10.21
-
06 June 201213 July 2012Interim5.5p790.0p£6.96
-
20 June 201213 July 2012Final2.97p131.9p£22.52
-
16 May 201213 July 2012Interim2.1p326.8p£6.43
-
16 May 201213 July 2012Final33.75p2835.0p£11.90
-
13 June 201218 July 2012Interim8.3p754.0p£11.01
-
27 June 201219 July 2012Final6.5p521.5p£12.46
-
23 May 201219 July 2012Interim7.0p930.0p£7.53
-
20 June 201220 July 2012Final5.4p354.6p£15.23
-
06 June 201220 July 2012Final1.95p130.58p£14.93
-
20 June 201220 July 2012Quarterly140.0p35590.0p£3.93
-
20 June 201220 July 2012Final13.47p1254.0p£10.74
-
06 June 201220 July 2012Final5.5p412.9p£13.32
-
27 June 201220 July 2012Final16.0p344.7p£46.42
-
20 June 201220 July 2012Final6.75p263.4p£25.63
-
27 June 201225 July 2012Final5.75p626.0p£9.19
-
20 June 201226 July 2012Quarterly7.4p961.0p£7.70
-
27 June 201226 July 2012Final7.0p122.8p£57.00
-
20 June 201227 July 2012Final17.0p2390.0p£7.11
-
20 June 201227 July 2012Special63.0p2071.0p£30.42
-
04 July 201227 July 2012Interim1.5p303.5p£4.94
-
20 June 201227 July 2012Final42.06p2071.0p£20.31
-
27 June 201227 July 2012Final7.74p459.0p£16.86
-
27 June 201227 July 2012Final2.67p86.15p£30.99
-
27 June 201230 July 2012Interim7.2p887.0p£8.12
-
27 June 201230 July 2012Final17.8p907.5p£19.61
-
02 May 201230 July 2012Final21.2p885.0p£23.95
-
11 July 201231 July 2012Quarterly2.0p245.0p£8.16
-
18 July 201231 July 2012Interim0.5p108.3p£4.62
-
13 June 201231 July 2012Final7.0p583.0p£12.01
-
August 2012Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
04 July 201201 August 2012Final4.2p208.5p£20.14
-
27 June 201201 August 2012Final7.67p255.0p£30.08
-
04 July 201201 August 2012Final2.35p86.5p£27.17
-
06 June 201201 August 2012Final6.47p194.55p£33.26
-
04 July 201201 August 2012Interim6.0p1303.0p£4.60
-
27 June 201201 August 2012Final62.5p4580.0p£13.65
-
04 July 201202 August 2012Final18.0p1518.0p£11.86
-
04 July 201202 August 2012Final28.2p991.5p£28.44
-
20 June 201202 August 2012Final14.7p489.6p£30.02
-
11 July 201203 August 2012Final5.86p413.4p£14.18
-
04 July 201203 August 2012Final14.0p304.76p£45.94
-
20 June 201203 August 2012Final21.34p787.0p£27.12
-
04 July 201203 August 2012Final6.4p230.0p£27.83
-
20 June 201203 August 2012Final2.75p387.4p£7.10
-
27 June 201203 August 2012Final17.8p875.5p£20.33
-
11 July 201203 August 2012Interim5.3p281.4p£18.83
-
18 July 201203 August 2012Final0.75p93.0p£8.06
-
18 July 201203 August 2012Final17.0p1287.0p£13.21
-
25 July 201206 August 2012Final9.0p484.6p£18.57
-
20 June 201207 August 2012Final5.2p260.0p£20.00
-
04 July 201207 August 2012Final17.0p1160.59p£14.65
-
04 July 201209 August 2012Interim2.1p298.2p£7.04
-
04 July 201209 August 2012Final31.2p1878.0p£16.61
-
04 July 201210 August 2012Quarterly6.6p631.5p£10.45
-
30 May 201210 August 2012Final3.3p44.0p£75.00
-
11 July 201213 August 2012Final3.45p357.0p£9.66
-
30 May 201215 August 2012Final25.35p836.0p£30.32
-
11 July 201215 August 2012Interim5.8p472.0p£12.29
-
11 July 201216 August 2012Quarterly9.0p1215.0p£7.41
-
18 July 201217 August 2012Interim31.7p2407.0p£13.17
-
08 August 201217 August 2012Final44.5p3432.5p£12.96
-
11 July 201217 August 2012Final16.05p127.4p£125.98
-
01 August 201217 August 2012Final40.0p2596.0p£15.41
-
11 July 201217 August 2012Interim7.24p663.5p£10.91
-
25 July 201220 August 2012Final19.0p1381.0p£13.76
-
01 August 201223 August 2012Interim7.0p842.0p£8.31
-
11 July 201224 August 2012Quarterly1.31p103.7p£12.63
-
13 June 201224 August 2012Final28.0p1248.0p£22.44
-
18 July 201224 August 2012Final5.95p519.0p£11.46
-
01 August 201230 August 2012Interim2.7p232.6p£11.61
-
25 July 201231 August 2012Quarterly3.3p545.0p£6.06
-
15 August 201231 August 2012Interim0.5p108.3p£4.62
-
08 August 201231 August 2012Interim6.0p751.0p£7.99
-
08 August 201231 August 2012Quarterly3.52p363.1p£9.69
-
08 August 201231 August 2012Interim1.31p72.52p£18.06
-
25 July 201231 August 2012Final20.75p875.5p£23.70
-
September 2012Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
08 August 201203 September 2012Interim1.21p294.0p£4.12
-
08 August 201204 September 2012Interim5.0p523.5p£9.55
-
15 August 201204 September 2012Interim6.12p124.1p£49.32
-
08 August 201204 September 2012Interim4.0p549.0p£7.29
-
25 July 201205 September 2012Interim3.5p342.0p£10.23
-
15 August 201205 September 2012Final21.77p1286.0p£16.93
-
08 August 201205 September 2012Final5.7p307.7p£18.52
-
01 August 201206 September 2012Interim6.6p693.0p£9.52
-
08 August 201206 September 2012Final11.18p1069.0p£10.46
-
15 August 201207 September 2012Interim2.41p549.5p£4.39
-
08 August 201207 September 2012Final10.2p406.3p£25.10
-
04 July 201207 September 2012Final19.5p1088.0p£17.92
-
22 August 201207 September 2012Quarterly1.375p192.0p£7.16
-
15 August 201207 September 2012Final2.5p633.5p£3.95
-
08 August 201207 September 2012Final2.0p190.3p£10.51
-
08 August 201207 September 2012Quarterly1.0p317.0p£3.15
-
08 August 201207 September 2012Interim4.0p373.4p£10.71
-
01 August 201207 September 2012Interim7.64p1194.0p£6.40
-
08 August 201207 September 2012Interim4.0p1305.0p£3.07
-
08 August 201207 September 2012Interim2.5p335.6p£7.45
-
08 August 201210 September 2012Final18.1p770.84p£23.48
-
08 August 201210 September 2012Interim58.1p3428.0p£16.95
-
15 August 201211 September 2012Interim9.82p1078.0p£9.11
-
22 August 201212 September 2012Quarterly38.28p1406.5p£27.22
-
08 August 201212 September 2012Quarterly18.92p2862.0p£6.61
-
15 August 201212 September 2012Interim6.0p521.5p£11.51
-
15 August 201213 September 2012Interim46.43p2867.0p£16.19
-
08 August 201213 September 2012Interim4.5p503.0p£8.95
-
15 August 201213 September 2012Interim20.27p1556.5p£13.02
-
08 August 201213 September 2012Interim0.89p133.2p£6.68
-
29 August 201213 September 2012Interim3.43p331.85p£10.34
-
22 August 201214 September 2012Interim6.0p625.0p£9.60
-
15 August 201214 September 2012Interim1.8p206.2p£8.73
-
15 August 201214 September 2012Interim15.0p1223.0p£12.26
-
08 August 201214 September 2012Interim5.25p510.0p£10.29
-
22 August 201214 September 2012Quarterly15.94p2237.0p£7.13
-
22 August 201218 September 2012Interim0.5p338.0p£1.48
-
22 August 201218 September 2012Interim7.0571p902.5p£7.82
-
05 September 201219 September 2012Interim4.7868p105.8p£45.24
-
22 August 201219 September 2012Interim4.25p579.59p£7.33
-
08 August 201219 September 2012Interim6.0p566.56p£10.59
-
29 August 201220 September 2012Interim1.9p247.3p£7.68
-
08 August 201220 September 2012Quarterly27.08p2287.0p£11.84
-
08 August 201220 September 2012Quarterly27.08p2216.5p£12.22
-
29 August 201221 September 2012Interim2.1p168.2p£12.49
-
25 July 201221 September 2012Final56.1p1606.0p£34.93
-
05 September 201221 September 2012Interim3.15p206.0p£15.29
-
15 August 201221 September 2012Interim2.5p942.5p£2.65
-
15 August 201221 September 2012Interim12.2p1811.0p£6.74
-
22 August 201221 September 2012Interim7.0p488.5p£14.33
-
22 August 201221 September 2012Interim9.5p531.23p£17.88
-
22 August 201221 September 2012Interim3.55p210.7p£16.85
-
29 August 201221 September 2012Interim2.0p170.4p£11.74
-
22 August 201224 September 2012Interim12.5p1883.0p£6.64
-
08 August 201224 September 2012Interim2.4p296.4p£8.10
-
08 August 201225 September 2012Quarterly5.02p476.4p£10.54
-
29 August 201225 September 2012Final4.31p128.11p£33.64
-
22 August 201225 September 2012Interim0.19p97.65p£1.95
-
15 August 201226 September 2012Interim42.2p3706.0p£11.39
-
12 September 201226 September 2012Interim0.67p92.5p£7.24
-
19 September 201226 September 2012Interim3.16p795.0p£3.97
-
22 August 201227 September 2012Interim8.4p1144.0p£7.34
-
08 August 201227 September 2012Interim56.0p4850.0p£11.55
-
15 August 201227 September 2012Interim13.0p2432.0p£5.35
-
12 September 201228 September 2012Interim14.4p1166.0p£12.35
-
05 September 201228 September 2012Quarterly2.55p346.7p£7.36
-
12 September 201228 September 2012Special6.84p989.0p£6.92
-
29 August 201228 September 2012Interim16.4p2835.0p£5.78
-
29 August 201228 September 2012Interim2.57p130.3p£19.72
-
12 September 201228 September 2012Final10.65p989.0p£10.77
-
22 August 201228 September 2012Interim13.5p1912.0p£7.06
-
12 September 201228 September 2012Interim0.5p108.3p£4.62
-
05 September 201228 September 2012Final35.7p1923.0p£18.56
-
29 August 201228 September 2012Interim3.62p828.0p£4.37
-
October 2012Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
15 August 201201 October 2012Final4.49p376.1p£11.94
-
29 August 201201 October 2012Quarterly2.32p450.0p£5.16
-
05 September 201201 October 2012Interim9.6p892.77p£10.75
-
29 August 201201 October 2012Interim1.96p180.0p£10.89
-
29 August 201202 October 2012Final14.9p693.01p£21.50
-
05 September 201203 October 2012Interim1.91p326.1p£5.86
-
29 August 201203 October 2012Final5.4p305.4p£17.68
-
12 September 201203 October 2012Interim17.0p1532.7p£11.09
-
05 September 201203 October 2012Interim3.4p358.5p£9.48
-
06 June 201203 October 2012Interim1.75p62.0p£28.23
-
05 September 201203 October 2012Final7.0p832.0p£8.41
-
05 September 201204 October 2012Interim4.0p1025.0p£3.90
-
12 September 201204 October 2012Interim5.36p961.0p£5.58
-
15 August 201204 October 2012Quarterly5.73p726.0p£7.89
-
05 September 201204 October 2012Interim21.0p651.0p£32.26
-
05 September 201204 October 2012Interim1.67p985.5p£1.69
-
08 August 201204 October 2012Quarterly17.0p1749.5p£9.72
-
05 September 201204 October 2012Interim1.74p2168.0p£0.80
-
29 August 201204 October 2012Interim26.75p2529.0p£10.58
-
05 September 201204 October 2012Interim7.5p414.8p£18.08
-
05 September 201205 October 2012Quarterly1.44p137.0p£10.51
-
05 September 201205 October 2012Interim3.25p376.6p£8.63
-
05 September 201205 October 2012Interim6.87p146.3p£46.96
-
08 August 201205 October 2012Interim2.08p550.5p£3.78
-
29 August 201205 October 2012Interim2.65p339.0p£7.82
-
05 September 201205 October 2012Interim1.0p165.25p£6.05
-
05 September 201205 October 2012Interim8.28p1731.0p£4.78
-
22 August 201205 October 2012Interim4.2p254.8p£16.48
-
05 September 201205 October 2012Interim6.0p410.0p£14.63
-
05 September 201205 October 2012Interim3.23p528.0p£6.12
-
15 August 201205 October 2012Interim7.7p521.0p£14.78
-
05 September 201205 October 2012Interim1.56p238.88p£6.53
-
05 September 201205 October 2012Interim4.9p286.7p£17.09
-
15 August 201205 October 2012Interim3.6p526.51p£6.84
-
08 August 201205 October 2012Final18.3p701.0p£26.11
-
05 September 201205 October 2012Interim7.05p290.2p£24.29
-
12 September 201208 October 2012Interim5.0p1116.0p£4.48
-
29 August 201208 October 2012Interim3.78p970.5p£3.89
-
12 September 201209 October 2012Interim1.72p131.4p£13.09
-
12 September 201210 October 2012Interim4.5p521.5p£8.63
-
12 September 201211 October 2012Interim8.0p755.5p£10.59
-
12 September 201211 October 2012Interim0.5p28.76p£17.39
-
08 August 201211 October 2012Interim17.39p1537.5p£11.31
-
22 August 201211 October 2012Interim6.7p729.0p£9.19
-
12 September 201212 October 2012Interim45.1p1298.0p£34.75
-
26 September 201212 October 2012Interim14.4p579.0p£24.87
-
05 September 201212 October 2012Interim11.8p1309.0p£9.01
-
12 September 201212 October 2012Quarterly7.4p961.0p£7.70
-
12 September 201215 October 2012Interim3.3p572.5p£5.76
-
12 September 201215 October 2012Interim6.1p258.0p£23.64
-
12 September 201215 October 2012Interim7.5p367.6p£20.40
-
12 September 201215 October 2012Interim7.9p995.0p£7.94
-
19 September 201217 October 2012Interim4.4p222.6p£19.77
-
12 September 201218 October 2012Interim1.55p160.2p£9.68
-
19 September 201218 October 2012Interim3.06p216.0p£14.17
-
12 September 201219 October 2012Interim3.0p129.5p£23.17
-
19 September 201219 October 2012Interim2.6p255.2p£10.19
-
22 August 201219 October 2012Interim15.0p1390.0p£10.79
-
19 September 201219 October 2012Interim5.0p446.9p£11.19
-
05 September 201219 October 2012Interim3.0p114.0p£26.32
-
19 September 201219 October 2012Interim3.42p246.6p£13.87
-
19 September 201219 October 2012Interim13.45p1340.0p£10.04
-
05 September 201219 October 2012Interim2.65p628.29p£4.22
-
19 September 201219 October 2012Interim6.3361p348.07p£18.20
-
03 October 201219 October 2012Interim2.616p570.5p£4.59
-
05 September 201219 October 2012Interim2.47p323.5p£7.64
-
05 September 201219 October 2012Quarterly140.0p35590.0p£3.93
-
19 September 201222 October 2012Final28.2p1756.0p£16.06
-
05 September 201222 October 2012Final26.9p2019.5p£13.32
-
26 September 201223 October 2012Final1.12p125.0p£8.96
-
19 September 201223 October 2012Final16.75p571.45p£29.31
-
19 September 201224 October 2012Interim6.4p491.44p£13.02
-
12 September 201225 October 2012Interim4.3p207.1p£20.76
-
26 September 201225 October 2012Final13.25p790.0p£16.77
-
26 September 201225 October 2012Final7.23p1572.0p£4.60
-
03 October 201225 October 2012Interim10.87p648.84p£16.75
-
26 September 201226 October 2012Interim3.42p396.0p£8.64
-
26 September 201226 October 2012Interim5.36p1345.0p£3.99
-
03 October 201226 October 2012Interim1.0p95.0p£10.53
-
26 September 201226 October 2012Interim3.9p723.5p£5.39
-
26 September 201226 October 2012Interim12.0p555.0p£21.62
-
10 October 201230 October 2012Interim6.13p782.5p£7.83
-
29 August 201231 October 2012Final2.5p146.2p£17.10
-
17 October 201231 October 2012Interim0.5p108.3p£4.62
-
03 October 201231 October 2012Quarterly3.5p245.0p£14.29
-
November 2012Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
03 October 201201 November 2012Interim5.87p967.0p£6.07
-
10 October 201201 November 2012Interim7.6p934.5p£8.13
-
03 October 201201 November 2012Final4.0p249.0p£16.06
-
26 September 201201 November 2012Interim9.95p2435.0p£4.09
-
03 October 201201 November 2012Interim6.0p1303.0p£4.60
-
19 September 201202 November 2012Interim2.7p285.1p£9.47
-
03 October 201202 November 2012Interim8.0p2289.84p£3.49
-
26 September 201205 November 2012Interim3.49p280.0p£12.46
-
05 September 201207 November 2012Interim5.4p251.18p£21.50
-
03 October 201207 November 2012Interim4.0p553.5p£7.23
-
10 October 201207 November 2012Interim1.0p173.3p£5.77
-
26 September 201207 November 2012Final1.25p82.0p£15.24
-
10 October 201208 November 2012Interim2.2p191.0p£11.52
-
03 October 201208 November 2012Interim5.0p122.8p£40.72
-
10 October 201209 November 2012Interim9.0p2055.0p£4.38
-
10 October 201209 November 2012Interim1.0p366.4p£2.73
-
03 October 201209 November 2012Quarterly6.6p631.5p£10.45
-
10 October 201209 November 2012Interim16.0p2787.0p£5.74
-
10 October 201209 November 2012Interim2.4p280.64p£8.55
-
17 October 201209 November 2012Interim13.5p2090.0p£6.46
-
10 October 201209 November 2012Final51.0p3950.0p£12.91
-
10 October 201212 November 2012Interim8.8p1146.0p£7.68
-
10 October 201212 November 2012Interim8.0p1566.0p£5.11
-
03 October 201212 November 2012Interim5.8p472.0p£12.29
-
26 September 201214 November 2012Interim4.62p389.7p£11.86
-
22 August 201214 November 2012Interim4.9p408.4p£12.00
-
24 October 201215 November 2012Interim5.6p273.8p£20.45
-
10 October 201215 November 2012Quarterly9.0p1215.0p£7.41
-
31 October 201216 November 2012Final55.5p1515.0p£36.63
-
03 October 201216 November 2012Final21.0p970.0p£21.65
-
17 October 201216 November 2012Interim12.0p1265.0p£9.49
-
10 October 201216 November 2012Interim3.09p327.0p£9.45
-
24 October 201216 November 2012Interim4.5p858.5p£5.24
-
24 October 201216 November 2012Final16.2p780.5p£20.76
-
10 October 201216 November 2012Final1.67p93.7p£17.82
-
19 September 201216 November 2012Interim10.0p328.9p£30.40
-
31 October 201216 November 2012Interim13.0p3161.84p£4.11
-
03 October 201216 November 2012Interim1.5p77.0p£19.48
-
24 October 201219 November 2012Final4.5p614.5p£7.32
-
17 October 201220 November 2012Interim5.0p341.3p£14.65
-
24 October 201222 November 2012Interim1.8p91.1p£19.76
-
17 October 201223 November 2012Interim7.9p1490.0p£5.30
-
26 September 201223 November 2012Interim3.41p113.4p£30.07
-
24 October 201223 November 2012Final26.25p1355.0p£19.37
-
07 November 201223 November 2012Final8.5p709.0p£11.99
-
26 September 201223 November 2012Interim3.0p744.5p£4.03
-
24 October 201223 November 2012Interim7.35p718.0p£10.24
-
07 November 201223 November 2012Final10.1p1425.0p£7.09
-
07 November 201223 November 2012Interim6.7p845.0p£7.93
-
17 October 201223 November 2012Quarterly1.21p103.7p£11.67
-
17 October 201227 November 2012Final27.5p1006.0p£27.34
-
19 September 201228 November 2012Final44.5p1228.0p£36.24
-
24 October 201229 November 2012Final8.0p641.0p£12.48
-
14 November 201230 November 2012Interim5.0p583.0p£8.58
-
14 November 201230 November 2012Interim0.5p108.3p£4.62
-
10 October 201230 November 2012Final40.0p3329.0p£12.02
-
17 October 201230 November 2012Interim7.8p414.1p£18.84
-
24 October 201230 November 2012Quarterly3.3p545.0p£6.06
-
31 October 201230 November 2012Interim0.38p130.58p£2.91
-
24 October 201230 November 2012Quarterly3.52p363.1p£9.69
-
14 November 201230 November 2012Interim1.31p72.52p£18.06
-
31 October 201230 November 2012Interim28.8p1527.0p£18.86
-
24 October 201230 November 2012Interim1.75p214.0p£8.18
-
31 October 201230 November 2012Interim0.3p242.7p£1.24
-
24 October 201230 November 2012Interim1.38p271.4p£5.08
-
31 October 201230 November 2012Interim0.94p128.11p£7.34
-
31 October 201230 November 2012Interim3.4p204.2p£16.65
-
31 October 201230 November 2012Interim0.8p130.1p£6.15
-
December 2012Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
07 November 201207 December 2012Final1.5p33.16p£45.24
-
07 November 201207 December 2012Interim2.0p91.25p£21.92
-
07 November 201207 December 2012Final10.75p415.9p£25.85
-
21 November 201207 December 2012Interim3.5p115.5p£30.30
-
10 October 201207 December 2012Interim5.6p236.5p£23.68
-
07 November 201207 December 2012Interim0.928p250.0p£3.71
-
07 November 201207 December 2012Quarterly1.0p317.0p£3.15
-
24 October 201207 December 2012Interim3.4p440.5p£7.72
-
07 November 201207 December 2012Final5.5p280.0p£19.64
-
24 October 201211 December 2012Final4.59p150.27p£30.55
-
21 November 201212 December 2012Quarterly8.98p1406.5p£6.38
-
07 November 201212 December 2012Quarterly19.77p2862.0p£6.91
-
21 November 201214 December 2012Interim7.9p1069.0p£7.39
-
28 November 201214 December 2012Interim6.3p480.5p£13.11
-
14 November 201214 December 2012Final2.2p298.0p£7.38
-
05 December 201214 December 2012Interim15.0p3432.5p£4.37
-
21 November 201214 December 2012Quarterly15.57p2237.0p£6.96
-
28 November 201214 December 2012Quarterly1.38p192.0p£7.19
-
28 November 201217 December 2012Interim13.0p1287.0p£10.10
-
21 November 201217 December 2012Interim3.45p230.0p£15.00
-
21 November 201219 December 2012Interim13.09p1286.0p£10.18
-
12 December 201219 December 2012Special56.05p795.0p£70.50
-
05 December 201220 December 2012Interim10.2p907.5p£11.24
-
14 November 201220 December 2012Quarterly26.86p2287.0p£11.74
-
14 November 201220 December 2012Quarterly26.86p2216.5p£12.12
-
07 November 201221 December 2012Quarterly5.59p476.4p£11.73
-
28 November 201221 December 2012Final10.0p870.0p£11.49
-
21 November 201221 December 2012Interim1.75p387.4p£4.52
-
10 October 201221 December 2012Interim4.63p380.0p£12.18
-
05 December 201228 December 2012Special31.15p2237.0p£13.92
-
12 December 201228 December 2012Interim8.0p484.6p£16.51
-
12 December 201228 December 2012Interim0.5p108.3p£4.62
-
05 December 201228 December 2012Quarterly2.55p346.7p£7.36
-
31 December 201231 December 2012Historical9.0p131.09p£68.66
-
31 December 201231 December 2012Historical0.0p273.0p£0.00
-
31 December 201231 December 2012Historical0.0p641.5p£0.00
-
31 December 201231 December 2012Historical0.0p395.0p£0.00
-
31 December 201231 December 2012Historical8.375p122.1p£68.59
-
31 December 201231 December 2012Historical0.0p144.5p£0.00
-
31 December 201231 December 2012Historical0.0p558.5p£0.00
-
31 December 201231 December 2012Historical0.0p1252.0p£0.00
-
31 December 201231 December 2012Historical0.0p116.0p£0.00
-
31 December 201231 December 2012Historical0.0p507.5p£0.00
-
31 December 201231 December 2012Historical7.375p126.0p£58.53
-
31 December 201231 December 2012Historical0.0p350.8p£0.00
-
31 December 201231 December 2012Historical9.75p128.25p£76.02
-
31 December 201231 December 2012Historical0.0p353.7p£0.00
-
31 December 201231 December 2012Historical0.0p166.8p£0.00
-
31 December 201231 December 2012Historical0.0p135.0p£0.00
-
31 December 201231 December 2012Historical7.375p115.0p£64.13
-
31 December 201231 December 2012Historical0.0p110.3p£0.00
-
31 December 201231 December 2012Historical0.0p152.0p£0.00
-
31 December 201231 December 2012Historical0.0p31.66p£0.00
-
31 December 201231 December 2012Historical9.25p83.0p£111.45
-
21 November 201231 December 2012Interim3.425p130.0p£26.35
-
31 December 201231 December 2012Historical0.0p390.9p£0.00
-
31 December 201231 December 2012Historical0.0p60.08p£0.00
-
31 December 201231 December 2012Historical0.0p325.0p£0.00
-
31 December 201231 December 2012Historical0.0p149.5p£0.00
-
28 November 201231 December 2012Quarterly2.32p450.0p£5.16
-
31 December 201231 December 2012Historical725.0p10000.0p£72.50
-
31 December 201231 December 2012Historical0.0p385.1p£0.00
-
31 December 201231 December 2012Historical8.625p105.5p£81.75
-
31 December 201231 December 2012Historical0.0p327.0p£0.00
-
January 2013Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
21 November 201202 January 2013Interim31.0p4580.0p£6.77
-
07 November 201202 January 2013Interim8.8p1308.0p£6.73
-
28 November 201202 January 2013Interim11.7p1051.0p£11.13
-
24 October 201202 January 2013Interim7.6p1190.0p£6.39
-
21 November 201202 January 2013Interim3.3p571.5p£5.77
-
05 December 201203 January 2013Interim3.63p255.0p£14.24
-
14 November 201203 January 2013Quarterly18.0p1749.5p£10.29
-
05 December 201204 January 2013Interim5.45p459.0p£11.87
-
28 November 201204 January 2013Interim4.3p885.0p£4.86
-
21 November 201204 January 2013Interim4.8p378.0p£12.70
-
28 November 201204 January 2013Interim7.4p875.5p£8.45
-
05 December 201204 January 2013Interim5.0p412.9p£12.11
-
05 December 201207 January 2013Interim9.7p1381.0p£7.02
-
05 December 201207 January 2013Final7.5p503.5p£14.90
-
05 December 201207 January 2013Special3.5p503.5p£6.95
-
05 December 201208 January 2013Interim2.55p208.5p£12.23
-
12 December 201209 January 2013Interim2.7p354.6p£7.61
-
12 December 201209 January 2013Interim2.97p131.9p£22.52
-
05 December 201209 January 2013Interim14.1p991.5p£14.22
-
07 November 201210 January 2013Interim19.5p2835.0p£6.88
-
05 December 201210 January 2013Quarterly7.4p961.0p£7.70
-
12 December 201210 January 2013Interim12.9p1878.0p£6.87
-
21 November 201210 January 2013Interim3.6p290.5p£12.39
-
05 December 201211 January 2013Interim30.34p2071.0p£14.65
-
05 December 201211 January 2013Interim5.0p263.4p£18.98
-
05 December 201211 January 2013Interim10.0p875.5p£11.42
-
14 November 201211 January 2013Interim0.8211p44.0p£18.66
-
14 November 201211 January 2013Interim6.2p475.0p£13.05
-
05 December 201211 January 2013Final2.3p93.5p£24.60
-
12 December 201211 January 2013Interim6.3p1160.59p£5.43
-
05 December 201211 January 2013Interim1.1p86.5p£12.72
-
05 December 201211 January 2013Final20.0p1932.0p£10.35
-
19 December 201214 January 2013Interim7.0p790.0p£8.86
-
12 December 201216 January 2013Final14.0p1261.0p£11.10
-
28 November 201216 January 2013Interim14.49p836.0p£17.33
-
02 January 201318 January 2013Interim7.4p570.5p£12.97
-
21 November 201218 January 2013Quarterly5.62p726.0p£7.74
-
05 December 201218 January 2013Quarterly140.0p35590.0p£3.93
-
05 December 201218 January 2013Final12.4p519.0p£23.89
-
12 December 201221 January 2013Special31.0p648.5p£47.80
-
28 November 201223 January 2013Final10.2p553.0p£18.44
-
14 November 201223 January 2013Interim1.0p154.4p£6.48
-
05 December 201224 January 2013Final7.1p479.1p£14.82
-
02 January 201324 January 2013Interim5.7p489.6p£11.64
-
19 December 201225 January 2013Interim4.0p832.0p£4.81
-
19 December 201225 January 2013Interim8.0p1518.0p£5.27
-
24 December 201225 January 2013Interim4.3p406.3p£10.58
-
19 December 201225 January 2013Interim7.15p770.84p£9.28
-
19 December 201225 January 2013Interim8.0p304.76p£26.25
-
05 December 201225 January 2013Interim9.4p1088.0p£8.64
-
02 January 201325 January 2013Interim7.4p693.01p£10.68
-
12 December 201228 January 2013Final3.9p149.4p£26.10
-
02 January 201330 January 2013Interim0.5p357.0p£1.40
-
19 December 201231 January 2013Quarterly1.79p137.0p£13.07
-
02 January 201331 January 2013Final18.6p754.0p£24.67
-
16 January 201331 January 2013Interim0.5p108.3p£4.62
-
26 December 201231 January 2013Quarterly2.0p245.0p£8.16
-
February 2013Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
02 January 201301 February 2013Interim1.47p86.15p£17.06
-
02 January 201301 February 2013Interim4.5p2390.0p£1.88
-
02 January 201301 February 2013Interim6.0p1303.0p£4.60
-
19 December 201201 February 2013Interim11.44p787.0p£14.54
-
09 January 201301 February 2013Quarterly2.0p373.4p£5.36
-
02 January 201301 February 2013Interim6.71p1254.0p£5.35
-
24 December 201204 February 2013Interim3.0p307.7p£9.75
-
12 December 201204 February 2013Interim4.6p260.0p£17.69
-
09 January 201304 February 2013Final0.0p262.4p£0.00
-
02 January 201304 February 2013Final6.65p586.5p£11.34
-
28 November 201205 February 2013Interim15.5p2596.0p£5.97
-
09 January 201305 February 2013Interim3.22p413.4p£7.79
-
02 January 201306 February 2013Interim4.06p519.0p£7.82
-
16 January 201306 February 2013Interim1.5p633.5p£2.37
-
21 November 201206 February 2013Interim3.27p194.55p£16.81
-
09 January 201307 February 2013Interim7.62p127.4p£59.81
-
02 January 201308 February 2013Interim6.6p344.7p£19.15
-
05 December 201208 February 2013Final1.37p155.0p£8.84
-
28 November 201208 February 2013Final12.4p758.5p£16.35
-
02 January 201311 February 2013Final4.4p298.2p£14.76
-
09 January 201311 February 2013Final4.5p303.5p£14.83
-
21 November 201214 February 2013Final14.75p930.0p£15.86
-
23 January 201315 February 2013Final6.05p637.5p£9.49
-
09 January 201315 February 2013Quarterly6.6p631.5p£10.45
-
16 January 201315 February 2013Interim1.1p190.3p£5.78
-
23 January 201315 February 2013Interim0.58p125.0p£4.64
-
16 January 201318 February 2013Final73.9p2407.0p£30.70
-
02 January 201318 February 2013Quarterly9.0p1215.0p£7.41
-
30 January 201322 February 2013Quarterly1.16p103.7p£11.19
-
06 February 201322 February 2013Interim5.0p583.0p£8.58
-
06 February 201322 February 2013Interim0.0p641.5p£0.00
-
06 February 201322 February 2013Final28.4p1628.0p£17.44
-
23 January 201325 February 2013Final14.1p887.0p£15.90
-
21 November 201225 February 2013Final5.5p326.8p£16.83
-
23 January 201326 February 2013Interim5.75p571.45p£10.06
-
30 January 201327 February 2013Interim5.8p472.0p£12.29
-
23 January 201328 February 2013Quarterly3.52p363.1p£9.69
-
13 February 201328 February 2013Final1.3125p72.52p£18.10
-
30 January 201328 February 2013Quarterly3.43p545.0p£6.29
-
06 February 201328 February 2013Final15.25p842.0p£18.11
-
06 February 201328 February 2013Interim0.5p108.3p£4.62
-
March 2013Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
30 January 201304 March 2013Final7.0p342.0p£20.47
-
30 January 201304 March 2013Final2.1p106.0p£19.81
-
06 February 201306 March 2013Interim2.6p305.4p£8.51
-
13 February 201308 March 2013Final6.67p362.2p£18.42
-
06 February 201308 March 2013Interim25.0p3950.0p£6.33
-
13 February 201308 March 2013Special3.0p82.0p£36.59
-
13 February 201312 March 2013Quarterly1.52p192.0p£7.92
-
20 February 201313 March 2013Quarterly5.11p1406.5p£3.63
-
06 February 201313 March 2013Quarterly20.39p2862.0p£7.12
-
20 February 201315 March 2013Quarterly16.6467p2237.0p£7.44
-
20 February 201315 March 2013Quarterly3.5p317.0p£11.04
-
13 February 201318 March 2013Final120.5p3428.0p£35.15
-
27 February 201322 March 2013Final21.5p1250.0p£17.20
-
23 January 201322 March 2013Interim25.2p1606.0p£15.69
-
20 February 201322 March 2013Final20.0p531.23p£37.65
-
20 February 201322 March 2013Interim1.25p146.2p£8.55
-
13 February 201328 March 2013Quarterly27.2p2216.5p£12.27
-
06 March 201328 March 2013Interim36.93p1923.0p£19.20
-
13 March 201328 March 2013Interim0.5p108.3p£4.62
-
20 March 201328 March 2013Special4.433p170.4p£26.02
-
27 February 201328 March 2013Final7.2p625.0p£11.52
-
13 March 201328 March 2013Quarterly2.55p346.7p£7.36
-
13 February 201328 March 2013Quarterly6.0p476.4p£12.59
-
13 February 201328 March 2013Quarterly27.2p2287.0p£11.89
-
13 March 201329 March 2013Final22.0p1166.0p£18.87
-
30 January 201331 March 2013Interim4.1875p122.1p£34.30
-
April 2013Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
27 February 201302 April 2013Final5.6p232.6p£24.08
-
27 February 201302 April 2013Special8.4p232.6p£36.11
-
13 March 201302 April 2013Interim3.6875p126.0p£29.27
-
27 February 201302 April 2013Interim3.6875p115.0p£32.07
-
30 January 201304 April 2013Interim8.76p701.0p£12.50
-
06 March 201304 April 2013Final2.42p294.0p£8.23
-
05 December 201204 April 2013Final2.5p62.0p£40.32
-
20 March 201305 April 2013Quarterly2.3175p450.0p£5.15
-
06 March 201305 April 2013Interim0.0p507.5p£0.00
-
06 March 201306 April 2013Interim4.3125p105.5p£40.88
-
27 February 201308 April 2013Interim18.1p2019.5p£8.96
-
06 March 201308 April 2013Final3.6p210.7p£17.09
-
06 March 201308 April 2013Interim11.33p1756.0p£6.45
-
20 February 201308 April 2013Interim2.35p376.1p£6.25
-
13 March 201308 April 2013Interim5.0p1425.0p£3.51
-
06 March 201308 April 2013Interim3.05p1572.0p£1.94
-
06 March 201309 April 2013Final13.39p663.5p£20.18
-
13 March 201309 April 2013Interim4.34p709.0p£6.12
-
06 March 201309 April 2013Final9.39p2168.0p£4.33
-
20 March 201310 April 2013Interim12.0p970.0p£12.37
-
06 March 201310 April 2013Final8.3p358.5p£23.15
-
06 March 201311 April 2013Final60.34p2867.0p£21.05
-
13 March 201311 April 2013Interim6.3p989.0p£6.37
-
20 February 201311 April 2013Quarterly22.0p1749.5p£12.58
-
20 March 201312 April 2013Interim25.5p1515.0p£16.83
-
06 March 201312 April 2013Interim0.825p33.16p£24.88
-
06 March 201312 April 2013Interim7.0p790.0p£8.86
-
20 March 201312 April 2013Interim14.0p1265.0p£11.07
-
13 March 201312 April 2013Interim4.35p415.9p£10.46
-
13 March 201312 April 2013Quarterly1.44p137.0p£10.51
-
20 March 201312 April 2013Interim4.5p870.0p£5.17
-
13 March 201312 April 2013Final7.9p693.0p£11.40
-
06 March 201315 April 2013Interim0.83p93.7p£8.86
-
06 March 201316 April 2013Interim4.5p131.09p£34.33
-
20 March 201317 April 2013Final6.0p795.0p£7.55
-
20 March 201317 April 2013Special68.0p795.0p£85.53
-
13 March 201317 April 2013Quarterly7.4p961.0p£7.70
-
20 March 201318 April 2013Final9.75p503.0p£19.38
-
20 March 201319 April 2013Interim15.0p2123.0p£7.07
-
06 March 201319 April 2013Quarterly140.0p35590.0p£3.93
-
13 March 201319 April 2013Final5.0p942.5p£5.31
-
06 March 201323 April 2013Final6.3p335.6p£18.77
-
27 March 201323 April 2013Interim11.0p780.5p£14.09
-
20 March 201324 April 2013Interim15.0p1006.0p£14.91
-
20 March 201325 April 2013Final34.16p1556.5p£21.95
-
20 March 201326 April 2013Final9.9p286.7p£34.53
-
20 March 201326 April 2013Final3.94p206.2p£19.11
-
10 April 201326 April 2013Interim0.5p108.3p£4.62
-
27 March 201326 April 2013Interim12.5p1355.0p£9.23
-
03 April 201326 April 2013Interim14.0p1248.0p£11.22
-
10 April 201330 April 2013Final8.6p723.5p£11.89
-
27 March 201330 April 2013Quarterly2.0p245.0p£8.16
-
May 2013Ex-Div DatePay DateTypeAmountCurrent PriceIncome per £1000
-
27 March 201301 May 2013Interim18.0p1303.0p£13.81
-
10 April 201301 May 2013Quarterly2.5p373.4p£6.70
-
13 March 201301 May 2013Interim4.41p150.27p£29.35
-
03 April 201301 May 2013Interim22.0p3329.0p£6.61
-
03 April 201301 May 2013Interim2.5p249.0p£10.04
-
20 March 201301 May 2013Final0.0p105.8p£0.00
-
03 April 201301 May 2013Final15.9p892.77p£17.81
-
06 March 201302 May 2013Interim0.0p225.9p£0.00
-
06 March 201302 May 2013Final14.0p488.5p£28.66
-
06 March 201303 May 2013Final1.21p133.2p£9.08
-
13 March 201303 May 2013Final5.94p323.5p£18.36
-
27 March 201303 May 2013Final12.0p566.56p£21.18
-
10 April 201303 May 2013Final1.0p541.0p£1.85
-
03 April 201303 May 2013Final30.0p1223.0p£24.53
-
27 March 201303 May 2013Special38.0p566.56p£67.07
-
03 April 201303 May 2013Final5.85p339.0p£17.26
-
03 April 201303 May 2013Final26.7p651.0p£41.01
-
03 April 201303 May 2013Final10.2p510.0p£20.00
-
10 April 201303 May 2013Final17.5p755.5p£23.16
-
10 April 201303 May 2013Final27.8p1811.0p£15.35
-
20 March 201303 May 2013Final4.5p528.0p£8.52
-
17 April 201306 May 2013Final3.0p129.5p£23.17
-
10 April 201307 May 2013Final8.3p553.5p£15.00
-
27 March 201307 May 2013Interim1.5p82.0p£18.29
-
20 March 201308 May 2013Quarterly11.96p726.0p£16.47
-
17 April 201308 May 2013Final10.6p782.5p£13.55
-
13 March 201308 May 2013Final92.7p3706.0p£25.01
-
17 April 201308 May 2013Final28.49p1078.0p£26.43
-
10 April 201308 May 2013Final9.5p1305.0p£7.28
-
10 April 201308 May 2013Final7.5p1116.0p£6.72
-
27 March 201309 May 2013Final30.0p2432.0p£12.34
-
20 March 201309 May 2013Final4.6p207.1p£22.21
-
13 March 201310 May 2013Final8.2p526.51p£15.57
-
10 April 201310 May 2013Special7.0p280.0p£25.00
-
10 April 201310 May 2013Final11.83p967.0p£12.23
-
27 March 201310 May 2013Quarterly6.6p631.5p£10.45
-
17 April 201310 May 2013Final4.2p281.4p£14.93
-
17 April 201313 May 2013Final5.0p255.2p£19.59
-
10 April 201313 May 2013Final12.7p572.5p£22.18
-
06 March 201313 May 2013Final37.8p1390.0p£27.19
-
03 April 201314 May 2013Final10.0p521.0p£19.19
-
27 March 201314 May 2013Final3.125p114.0p£27.41
-
13 March 201314 May 2013Final37.53p1537.5p£24.41
-
10 April 201315 May 2013Interim5.8p472.0p£12.29
-
17 April 201316 May 2013Final8.0p1025.0p£7.80
-
03 April 201316 May 2013Quarterly13.5p1215.0p£11.11
-
24 April 201316 May 2013Final11.25p273.8p£41.09
-
24 April 201316 May 2013Final30.0p1532.7p£19.57
-
17 April 201316 May 2013Final16.675p902.5p£18.48
-
20 March 201317 May 2013Final11.51p550.5p£20.91
-
24 April 201317 May 2013Final10.9p579.0p£18.83
-
17 April 201317 May 2013Final37.0p2787.0p£13.28
-
17 April 201317 May 2013Final2.83p985.5p£2.87
-
24 April 201317 May 2013Final6.6p206.0p£32.04
-
06 March 201317 May 2013Interim21.5p1228.0p£17.51
-
24 April 201317 May 2013Final8.26p124.1p£66.56
-
20 March 201317 May 2013Final9.0p328.9p£27.36
-
10 April 201320 May 2013Final4.8p296.4p£16.19
-
17 April 201320 May 2013Final14.09p290.2p£48.55
-
17 April 201320 May 2013Final3.0p366.4p£8.19
-
10 April 201320 May 2013Final20.7p1309.0p£15.81
-
03 April 201320 May 2013Final14.1p491.44p£28.69
-
03 April 201321 May 2013Special12.8p408.4p£31.34
-
24 April 201321 May 2013Final5.26p326.1p£16.13
-
10 April 201321 May 2013Final26.6p2835.0p£9.38
-
24 April 201321 May 2013Final12.5p521.5p£23.97
-
03 April 201321 May 2013Final9.8p408.4p£24.00
-
17 April 201321 May 2013Final1.43p92.5p£15.46
-
17 April 201321 May 2013Final0.43p97.65p£4.40
-
22 May 201322 May 2013Final2.25p77.0p£29.22
-
17 April 201322 May 2013Final7.47p828.0p£9.02
-
24 April 201322 May 2013Final2.7p91.1p£29.64
-
10 April 201322 May 2013Final11.25p258.0p£43.60
-
24 April 201322 May 2013Final10.2p523.5p£19.48
-
13 March 201322 May 2013Final7.45p628.29p£11.86
-
10 April 201323 May 2013Final16.5p414.8p£39.78
-
27 March 201323 May 2013Final20.79p1144.0p£18.17
-
01 May 201323 May 2013Interim5.0p583.0p£8.58
-
24 April 201323 May 2013Final15.63p1731.0p£9.03
-
06 March 201323 May 2013Interim0.0p325.0p£0.00
-
01 May 201323 May 2013Final17.0p751.0p£22.64
-
17 April 201323 May 2013Final6.7p970.5p£6.90
-
13 March 201324 May 2013Final27.75p1487.0p£18.66
-
24 April 201324 May 2013Final13.347p348.07p£38.35
-
15 May 201324 May 2013Final18.32p648.84p£28.24
-
10 April 201324 May 2013Final3.34p216.0p£15.46
-
10 April 201324 May 2013Final6.39p579.59p£11.03
-
01 May 201324 May 2013Final45.5p1298.0p£35.05
-
24 April 201324 May 2013Final5.9p396.0p£14.90
-
17 April 201324 May 2013Quarterly1.24p103.7p£11.96
-
27 March 201324 May 2013Final2.0p95.0p£21.05
-
10 April 201324 May 2013Final6.88p285.1p£24.13
-
27 March 201324 May 2013Final6.0p744.5p£8.06
-
24 April 201324 May 2013Final13.5p410.0p£32.93
-
01 May 201324 May 2013Final15.0p555.0p£27.03
-
17 April 201324 May 2013Final28.4p1340.0p£21.19
-
01 May 201324 May 2013Final8.085p130.3p£62.05


